Actually I have some thoughts on that.
My issue would be why claw through all that concrete and rebar for 4 Zyklon ceiling holes? Why not just used use 3 to 4 inch pipe through the ceiling as shown in the attachedHansHill wrote: ↑Fri May 02, 2025 2:48 pm Yes Mr Ziffel - My screenshot is from the section on discussion on the 4 small circular ventilation holes, not the Zyklon insertion holes.
My apologies for muddying the water, but my point was to address the integrity / rebar issue of the structure, which is present in these holes, and thus therefore, a consideration for the rebar issue on the Z-holes.
EDIT
My point ultimately being, if you tamper with rebar like this, you invite structural integrity issues such as is seen with the ventilation holes becoming cracked and compromised.
That could be the gas chamber that a naked Irene Zisblatt was hiding next to when a jewish boy wrapped her in a blanket, threw her over the fence, and across the railroad yard into a waiting train.Fred Ziffel wrote: ↑Sat May 03, 2025 1:13 am Cannot give you anything about 8, but for what it is worth, here is an interesting view of the Crem 2 being built. The roof sticking out of the ground is the said gas chamber